UTSA campus planning
Phase I, Building construction and site preparation
Phase II, Building construction and site preparation
Academic Business Building I
Engineering and Biotechnology Building
Academic III Building [Main Building]
Recreation and Wellness Center
Student dormitories
University Center
UTSA Downtown
Energy and utilities
Health and safety
Assorted projects
Correspondence
Administrative records
Charles Lampe, Director of Campus Planning, Project files
|
A Guide to the University of Texas at San Antonio. Office of Facilities Records, 1956-2008
|
|
|
|
|
Creator: |
University of Texas at San Antonio. Office of Facilities. |
|
Title: |
University of Texas at San Antonio. Office of Facilities Records |
|
Dates: | 1956-2008 |
|
|
Creator Abstract: |
The University of Texas at San Antonio Office of Facilities is a division of the Vice President for Business Affairs that oversees building construction, planning, and maintenance on UTSA campuses. |
|
Content Abstract: |
The University of Texas at San Antonio: Office of Facilities Records consists of campus planning files, architectural drawings, construction records, reports, surveys, correspondence, and project files that document the planning, design, construction and maintenance of the University of Texas at San Antonio campus. |
|
Identification: |
UA 04.02.02 |
|
Extent: |
55 linear feet (53 boxes + 2 oversize boxes) |
|
Language: |
Materials are in English. |
|
Repository: |
University of Texas at San Antonio Libraries Special Collections |
The University of Texas at San Antonio Office of Facilities is a division of the Vice President for Business Affairs that oversees building construction, planning, and maintenance on UTSA campuses. The division is organized into six departments which report to the Associate Vice President for the Office of Facilities: Planning and Development, Operations and Maintenance, Engineering and Project Management, Housekeeping and Event Service, Business Operations, and Downtown Campus Facilities.
UTSA’s Office of Facilities was original created in 1973 as UTSA’s Division of the Physical Plant and was responsible for maintenance of UTSA’s Kroger Center campus and overseeing the construction of UTSA’s main campus at 1604. The Division of the Physical Plant’s first director was George Mangrem (1973-1987), Walter Grinke (1988-1993), José Geraldo (Lalo) Gómez (1994-1999), George Morales (1999-2006), and Dave Riker (2006-present).
Following is a chronology of UTSA building projects:
Timeline of Major UTSA Building Projects
|
|
|
|
1974 |
Physical Plant designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $1,293,681. |
|
1975 |
Humanities & Social Sciences Building designed by Ford Powell and Carson, Architects and Bartlett Cocke & Associates, Inc., Architects and constructed for $7,841,018. |
|
1975 |
Science Building designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $9,712,777. |
|
1975 |
Arts Building designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $3,289,156. |
|
1975 |
Physical Education Building designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $1,535,455. |
|
1975 |
Convocation Center designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $4,227,460. |
|
1976 |
John Peace Library designed by Ford Powell and Carson, Architects and Bartlett Cocke and Associates, Inc., Architects and constructed for $10,120,489. |
|
1980 |
Multidisciplinary Studies Building designed by Bartlett Cocke and Associates, Inc., Architects and constructed for $11,897,884. |
|
1986 |
University Center designed by O’Neill Conrad Oppelt, Architects and constructed for $9,253,402. |
|
1990 |
Engineering Building designed by Bartlett Cocke and Associates, Inc., Architects and constructed for $9,253,402. |
|
1996 |
Business Building designed by Ford, Powell and Carson, Architects and constructed for $23,660,029. |
|
1997 |
Biosciences Building designed by Ford, Powell and Carson, Architects and constructed for $10,159,424. |
|
1997 |
Recreation Wellness Building designed by Garza-Bomberger, Architects and constructed for $15,270,523. |
|
1997 |
Main Building designed by Hellmuth, Obata and Kassabaum L.P. (HOK) Architects and constructed for $52,332,154. |
|
1997 |
Downtown Campus Frio Street Building designed by Saldana and Associates, Inc., Architects and constructed for $17,545,144. |
|
1999 |
Downtown Campus Buena Vista St. Building designed by Saldana and Associates, Inc., Architects and constructed for $18,852,453. |
|
2001 |
Downtown Campus Durango St. Building designed Ford, Powell and Carson, Architects and constructed for $25,750,065. |
|
2006 |
Biotechnology Sciences and Engineering Building designed by FKP Architects Inc. and constructed for $84,000,000. |
Return to the Table of Contents
The University of Texas at San Antonio Office of Facilities Records consists of campus planning files, architectural drawings, construction records, reports, surveys, correspondence, and project files that document the planning, design, construction and maintenance of the University of Texas at San Antonio campus. The collection includes records related to building construction projects on the UTSA campus including Phases I-II of Main Campus, UTSA Downtown Campus, and a majority of other building projects from the 1970s through the mid-2000s. The bulk of the collection are correspondence and project files of the Director of Facilities and the Director of Planning and Development. The collection is roughly organized into sixteen series by construction project, subject, or record type. The final series are project files of the Director of Planning and Development.
Return to the Table of Contents
|
|
|
Organization of Collection |
|
|
|
|
Series 1. UTSA campus planning |
|
|
Series 2. Phase I, Building construction and site preparation |
|
|
Series 3. Phase II, Building construction and site preparation |
|
|
Series 4. Academic Business Building I |
|
|
Series 5. Engineering and Biotechnology Building |
|
|
Series 6. Academic III Building [Main Building] |
|
|
Series 7. Recreation and Wellness Center |
|
|
Series 8. Student dormitories |
|
|
Series 9. University Center |
|
|
Series 10. UTSA Downtown |
|
|
Series 11. Energy and utilities |
|
|
Series 12. Health and safety |
|
|
Series 13. Assorted projects |
|
|
Series 14. Correspondence |
|
|
Series 15. Administrative records |
|
|
Series 16. Charles Lampe, Director of Campus Planning, Project files |
Return to the Table of Contents
Access Restrictions
This collection is housed at UTSA's Hemisfair Campus and must be accessed via the Institute of Texan Cultures Special Collections Reading Room. To request access, please use our Collections Request Form.
Use Restrictions
The researcher assumes full responsibility for observing all copyright, property, and libel laws as they apply.
Return to the Table of Contents
|
|
|
|
|
|
|
Organizations |
|
|
University of Texas at San Antonio. Office of Facilities. |
|
Subjects |
|
|
Campus planning--Texas. |
|
|
Universities and colleges--Texas--Buildings. |
|
|
Universities and colleges--Texas--Planning. |
|
|
Universities and colleges--Texas--Designs and plans. |
|
Locations |
|
|
San Antonio (Tex.)--History--20th century. |
|
Genres/Formats |
|
|
Architectural drawings. |
|
|
Blueprints (reprographic copies). |
|
|
Correspondence. |
|
|
Landscape architecture drawings. |
|
|
Newsletters. |
|
|
Photographs. |
|
|
Working drawings. |
|
Local Subjects |
|
|
UTSA History |
|
|
UTSA Records |
Return to the Table of Contents
[Identification of item], University of Texas at San Antonio: Office of Facilities Records, UA 04.02.02, University of Texas at San Antonio Libraries Special Collections.
Transferred from the University of Texas at San Antonio Office of Facilities in 2010 and 2012 (Acc. 2010-060 and Acc. 2012-001).
Encoded by Sean Heyliger, January, 2012.
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UTSA campus planning |
Box |
1 |
|
|
Historic property survey, 1994 |
|
|
|
Planning [early UTSA planning]1968-1986 |
|
|
|
Project funding, 1970-1975 |
|
|
|
State preparation, 1972 |
|
|
|
Space planning, 1970-1971 |
|
|
|
Strategic planning |
|
|
|
|
The University of Texas at San Antonio strategic plan through 1990-1991, undated |
|
|
|
|
The University of Texas at San Antonio strategic plan through 1992-1993, undated |
|
|
|
|
The University of Texas at San Antonio strategic plan through 1998-1999, undated |
Box |
8 |
|
|
Legislative Budget Board (LBB),1980-1982, 1987 |
|
|
|
Facilities planning standards,1990 |
|
|
|
1993 Comprehensive planning guide: A Vision for the Future |
Box |
8 |
|
|
|
Copy 1, 1993 |
|
|
|
|
Copies 2-4, 1993 |
|
|
|
|
Executive summary, 1993 |
Box |
8 |
|
|
Office of Facilities Planning and Construction long range campus planning, 1973-1998 |
|
|
|
Permanent university fund (PUF) |
Box |
8 |
|
|
|
1983-1989 |
|
|
|
|
1990 |
Box |
9 |
|
|
|
1991-1997 |
|
|
|
Strategic initiatives |
|
|
|
|
1996-1997 |
|
|
|
|
1995-1996 |
|
|
|
|
1994-1995 |
|
|
|
UTSA master plan |
|
|
|
|
Ford, Powell, Carson |
Box |
47 |
|
|
|
|
Draft, July, 1991 |
Box |
9 |
|
|
|
|
Final report, 1991 |
|
|
|
|
1975-1992 |
|
|
|
|
1993-1994 |
Box |
10 |
|
|
|
1995-1998 |
Box |
47 |
|
|
Downtown Campus: Comprehensive Planning Guide [3 copies], 1995 |
Box |
48 |
|
|
Worrell Design Group, "Campus-wide Foodservice Masterplan for the University of Texas at San Antonio, The Loop 1604 Campus and the Downtown Campus,"April 17, 2006 |
Box |
49 |
|
|
University of Texas System, Office of Facilities Planning and Construction, "Owner's design guidelines,", [2 copies]September 1, 1997 |
|
|
|
Assorted maps |
|
|
|
|
Campus master plan, Barnes Gromatsky, Kosarek Architects |
Drawer |
69 |
|
|
|
|
Existing map, undated |
|
|
|
|
|
Scheme K-5 Phase 2, undated |
Drawer |
69 |
|
|
|
UTSA athletics facilities schematic master plan, undated |
|
|
|
|
UTSA planning aerial maps |
Drawer |
69 |
|
|
|
|
Campus construction aerials, circa 1974 |
Drawer |
69 |
|
|
|
|
June, 2008 |
|
|
|
|
|
undated |
|
|
|
|
Campus master plan, 2007 |
|
|
|
|
Campus parking map, Spring, 2007 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Phase I, Building construction and site preparation |
|
|
|
Aerial photographs of phase I construction, 1973-1975 View Contents
|
Box |
1 |
|
|
Building construction, 1972-1977 |
|
|
|
Building Construction Specifications, Ford, Powell, Carson, Architects, and Barlett Cocke and Associates, Inc. |
Box |
45 |
|
|
|
Phase I, Volume I [3 copies], 1972 |
Box |
46 |
|
|
|
Phase I, Volume I [3 copies], 1972 |
|
|
|
|
Phase I, Volume II, 1972 |
|
|
|
|
Phase I, Site development, 1972 |
|
|
|
|
Phase I, Site development, Second segment of Phase I site development,1972 |
Box |
1 |
|
|
Completion and progress report, 1972-1977 |
|
|
|
Construction meeting minutes,1973-1974 |
|
|
|
Construction problems, 1973-1975 |
|
|
|
Construction project status reports |
|
|
|
|
1996-1997 |
|
|
|
|
1982-1987 |
Box |
2 |
|
|
|
1982-1987 |
|
|
|
|
1976-1981 |
|
|
|
Performance bonds and insurance requirements, 1972-1976 |
|
|
|
Pre-construction conference, 1972-1974 |
|
|
|
Arts Building, 1971-1992 |
|
|
|
Building names, 1975 |
|
|
|
Convocation and Physical Education Building |
|
|
|
|
1971-1982 |
|
|
|
|
1983-1995 |
|
|
|
Graphics interior, 1970-1980 |
|
|
|
Humanities and Social Science Building,1971-1998 |
|
|
|
John Peace Library cafeteria, 1971-1992 |
Box |
3 |
|
|
John Peace Library, 1971-1997 |
Drawer |
45 |
|
|
|
"A program for the John Peace Library fourth floor at the University of Texas at San Antonio,"2006 |
|
|
|
|
Renovation floorplans,2000-2001 |
Box |
3 |
|
|
Physical Plant, 1971-1976 |
|
|
|
Science Building |
|
|
|
|
1971-1975 |
|
|
|
|
1975-1997 |
|
|
|
Environmental rooms, 1976-1988 |
|
|
|
Sombrilla, 1975-1994 |
|
|
|
Utility tunnels, 1975 |
|
|
|
Vehicle maintenance, 1975-1976 |
|
|
|
Report of defects |
|
|
|
|
Arts Building,1976-1991 |
|
|
|
|
Ceiling tile,1976-1977 |
|
|
|
|
Circuit breakers,1976-1977 |
|
|
|
|
Convocation and Physical Education Building,1975-1985 |
|
|
|
|
Domestic hot water,1978 |
|
|
|
|
Humanities Business Building,1975-1977 |
Box |
4 |
|
|
|
John Peace Library,1976-1999 |
|
|
|
|
John Peace Library cafeteria, 1976-1998 |
|
|
|
|
Assorted items, 1976-1978 |
|
|
|
|
Motor/bearings/lube,1975-1979 |
|
|
|
|
Motor starters,1975-1978 |
|
|
|
|
Physical Plant Building,1975-1977 |
|
|
|
|
Science Building,1975-1979 |
|
|
|
|
Science Education Building roof,1976-1977 |
|
|
|
|
Sombrilla,1973-1978 |
|
|
|
T.C. Bateson claims, 1975-1980 |
|
|
|
Start up/interface projects, 1976-1977 |
|
|
|
Addition to Small Animal Building, 1991-1996 |
|
|
|
Greenhouse, 1980 |
|
|
|
Incinerator, 1974-1992 |
|
|
|
Irradiator room (UTHSC), 1960-1978 |
|
|
|
Library Annex/Print Shop, 1973-1976 |
|
|
|
Life science research labs, 1996 |
|
|
|
Power and Dynamics Systems Lab II Building, 1990-1991 |
|
|
|
Additional Science Facility report of defects, 1975-1977 |
|
|
|
Science Lab facilities |
|
|
|
|
1974-1976 |
Box |
5 |
|
|
|
1977-1996 |
Box |
47 |
|
|
|
Construction specifications, Volumes I-II, 1974 |
Box |
5 |
|
|
Tennis Center, 1990 |
|
|
|
Business Services Annex Building |
|
|
|
|
1987-1993 |
|
|
|
|
1993-1996 |
|
|
|
Warehouse, 1972-1976 |
|
|
|
West campus storage facility, 1991-1993 |
|
|
|
Parking lots |
|
|
|
|
Additional parking lots, 1978-2000 |
|
|
|
|
Additional surface parking, 1988 |
|
|
|
|
John Peace Library parking lot south, 1992-1996 |
|
|
|
|
Lot #4 extension/ADA parking lot, 1994-1996 |
|
|
|
|
Mini-car parking program, 1982-1985 |
Box |
6 |
|
|
|
New surface parking, 1988-1993 |
|
|
|
|
Parking lot #1A, #9, and extension to #9, 1982-1992 |
|
|
|
|
Parking lot entrance road, 1993-1994 |
|
|
|
|
Parking lots phase I, 1973-1986 |
|
|
|
|
Parking lots phase II pre-construction conference, 1979- |
|
|
|
|
Report of defects, 1975-1976 |
|
|
|
|
Supervision reports, 1974-1975 |
|
|
|
|
Temporary parking, 1987 |
|
|
|
Site development segment 1, 1972-1991 |
|
|
|
Site preparation, 1971-1975 |
|
|
|
1604 - IH 10 improvements, 1979-1982, 1990-1993 |
|
|
|
City and campus streets, 1971-1986 |
|
|
|
Loop 1604 - IH10 environmental impact statement, 1978-1979 |
|
|
|
State highway off campus roads, 1971-1996 |
Box |
7 |
|
|
Zoning notices/City of San Antonio, 1996-1998 |
|
|
|
Campus illumination and signage, 1992-1997 |
|
|
|
Campus lighting master plan, 1996-1998 |
|
|
|
Graphic interior, 1972-1976 |
|
|
|
Report of defects-site development, 1976-1977 |
|
|
|
Site development segment II, |
|
|
|
|
1974-1976 |
|
|
|
|
1977-1991 |
|
|
|
Site development service reports, 1975-1977 |
|
|
|
Site development phase I contract, 1977 |
|
|
|
Request for federal assistance, 1971-1976 |
|
|
|
Site development pre-construction conference, 3rd segment of phase I, 1977 |
|
|
|
Site development supervision reports, 1977-1978 |
|
|
|
Site development 3rd segment of phase III drawings, 1977-1979 |
|
|
|
Fountain pump room, 1978 |
|
|
|
Athletics |
Box |
7 |
|
|
|
Tennis courts |
|
|
|
|
|
Report of defects, 1979 |
|
|
|
|
|
Segment III site development, 1977-1988 |
Box |
8 |
|
|
|
Track and playing field, 1975-1995 |
|
|
|
|
Baseball and softball fields, 1992-1997 |
|
|
|
|
Convocation floor installation, 1996 |
|
|
|
|
Multipurpose recreation facility, 1984-1990 |
|
|
|
|
UTSA Intramural lighting project, 1996 |
|
|
|
|
Volleyball courts, 1990 |
Box |
10 |
|
|
Interior signage all phases, 1979-1997 |
Box |
8 |
|
|
Science Building renovation, 1990-1997 |
Box |
22 |
|
|
Bleachers for Convocation Center, 1971-1980 |
|
|
|
Carpeting, 1974-1978 |
|
|
|
Concrete mix design, 1973 |
|
|
|
Draperies, 1974-1975 |
|
|
|
Fixed seating, 1974-1978 |
Box |
23 |
|
|
Furniture and equipment, 1971-1978 |
|
|
|
Gym and physical education equipment, 1973-1974 |
|
|
|
Case study for remodeling of rooms in Humanities-Business Building, 1980-1981 |
|
|
|
Science Lab furniture (Hamilton), 1975-1977 |
|
|
|
Synthetic flooring (Versaturf). 1969-184 |
|
|
|
Staging and choral risers, 1974-1998 |
|
|
|
System renovation (sound), 1992 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Phase II, Building construction and site preparation |
Box |
10 |
|
|
Building and planning,1974-1980 |
|
|
|
Building Construction Specifications, Ford, Powell, Carson, Architects, and Barlett Cocke and Associates, Inc. |
Box |
46 |
|
|
|
Phase II, Volume I [copy 1], undated |
Box |
47 |
|
|
|
Phase II, Volume I [copy 2], undated |
|
|
|
|
Phase II, Volume II [copy 1-2], undated |
Box |
10 |
|
|
Contracts,1977-1984 |
|
|
|
Pre-construction conference,1977-1983 |
|
|
|
Building supervision reports,1976-1980 |
|
|
|
Air handling units #44, 45, 48, 49, 50,1980-1983 |
|
|
|
Arts Building |
Box |
11 |
|
|
|
Arts Building addition, 1980-1998 |
|
|
|
|
Recital Hall organ,1980-1997 |
|
|
|
|
Completion,1979-1983 |
|
|
|
|
Arts Building dimmer module, 1982-1985 |
|
|
|
|
Porte cochere, 1982-1986 |
|
|
|
|
Recital Hall lighting re-work, 1983-1997 |
|
|
|
|
Recital Hall seating, 1980-1984 |
|
|
|
Liquidation damages information,1980 |
|
|
|
Multidisciplinary Science Building |
|
|
|
|
Completion, 1977-1983 |
|
|
|
|
Pending, 1979-1981 |
|
|
|
|
Multidisciplinary Science Building, 1975-1982 |
|
|
|
Aluminum door re-work, 1980-1984 |
|
|
|
Building plaques,1980-1981 |
|
|
|
Buildings |
|
|
|
|
1975-1978 |
|
|
|
|
1979-1982 |
|
|
|
Completion, 1979-1984 |
Box |
12 |
|
|
Landscaping, 1980-1996 |
|
|
|
Completion of Multidisciplinary Science Building graphics,1981 |
|
|
|
Completion supervision reports, 1977-1982 |
|
|
|
Report of defects |
Box |
11 |
|
|
|
Arts Building, 1980-1981 |
|
|
|
|
Multidisciplinary Building, 1980-1982 |
|
|
|
|
Rain leaks, 1980-1983 |
|
|
|
|
Sculpture and Ceramics studio, 1978-1979 |
|
|
|
|
Arts Building addition, 1982-1984 |
|
|
|
|
Multidisciplinary Science Building completion, 1981-1984 |
Box |
12 |
|
|
Sculpture and Ceramics studio |
Box |
11 |
|
|
|
Fire, 1995 |
|
|
|
|
Air compressor, 1992 |
Box |
12 |
|
|
Keys and hardware, 1977-1983, 1998 |
|
|
|
Carpeting and drapes, 1977-1982 |
|
|
|
Completion-furnishing and equipment needs, 1976-1982 |
Box |
13 |
|
|
Furniture and equipment, 1978-1981 |
|
|
|
Annual tickler warranties, 1977 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Academic Business Building I |
Box |
13 |
|
|
Campus design standards, 1994 |
|
|
|
Planning and construction files |
Box |
15 |
|
|
|
1985-1991 |
Box |
14 |
|
|
|
1985-1991 |
|
|
|
|
1992 |
|
|
|
|
January-October, 1992 |
|
|
|
|
November, 1992- June, 1993 |
|
|
|
|
May-June, 1993 |
Box |
13 |
|
|
|
July, 1993-June, 1994 |
|
|
|
|
July-December, 1994 |
|
|
|
|
1995 |
|
|
|
|
1996-1997 |
|
|
|
|
1997 |
|
|
|
Campus design standards, 1994 |
Box |
14 |
|
|
Bidding list, 1995-1996 |
Box |
15 |
|
|
Contractor's pay estimates |
|
|
|
|
1995-1997 |
|
|
|
|
1996-1997 |
|
|
|
Report of defects, 1996-1997 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Engineering and Biotechnology Building |
Box |
15 |
|
|
Contractor's pay estimates |
|
|
|
|
1989 |
|
|
|
|
1990-1991 |
|
|
|
|
1990-1991 |
Box |
16 |
|
|
|
1996-1998 |
|
|
|
Report of defects |
Box |
15 |
|
|
|
1991 |
Box |
16 |
|
|
|
1998 |
|
|
|
Furniture and equipment, 1996 |
|
|
|
Transmittal letters, 1998 |
|
|
|
Planning and construction files |
Box |
17 |
|
|
|
1979-1987 |
|
|
|
|
January-August, 1988 |
|
|
|
|
1988-1991 |
|
|
|
|
Phase II February, 1994-April, 1995 |
|
|
|
|
Phase II 1995-1998 |
|
|
|
Keys and hardware, 1989-1990 |
Box |
18 |
|
|
Furniture and furnishings, 1990-1992 |
|
|
|
Job meetings, 1989-1990 |
|
|
|
Pre-construction conference, 1989-1990 |
Box |
48 |
|
|
Request for statement of qualifications for architect/engineer professional services, October 11, 2000 |
|
|
|
Statement of qualifications |
Box |
49 |
|
|
|
Garza, Bomberger and Associates, undated |
|
|
|
|
FKP Architects, November 10, 2000 |
Box |
48 |
|
|
Garza, Bomberger, and Associates,"A facility assessment report for existing science spaces at the 1604 campus", November 5, 2004 |
|
|
|
Garza, Bomberger, and Associates,"Biotechnology, Sciences, and Engineering Building phase II workshop #5 handouts" [2 copies], August 19, 2004 |
|
|
|
Garza, Bomberger, and Associates,"Biotechnology, Sciences, and Engineering Building phase II workshop #9 handouts" [2 copies], October 29, 2004 |
|
|
|
Garza, Bomberger, and Associates,"Schematic design submittal for the new Biotechnology, Sciences, and Engineering Building phase II", January 4, 2005 |
|
|
|
Form for planned payments by prime firm to the historically underutilized business (HUB) prime firm and/or a first tier firm, June 13, 2003 |
|
|
|
Biotechnology, Sciences, and Engineering Building summer lunch and tour, August 15, 2005 |
|
|
|
Biotechnology, Sciences, and Engineering Building executive summary, March, 2004 |
|
|
|
UT System project planning form, March 19, 2004 |
Drawer |
45 |
|
|
100% schematic design plans, March 11, 2005 |
|
|
|
Conceptual design cost comparison, undated |
Drawer |
59 |
|
|
Floorplans, 2005 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Academic III Building [Main Building] |
Box |
48 |
|
|
Summary report for design phase partnering workshop [3 copies],May 4, 2000 |
|
|
|
Facility Programming and Consulting, "A program for the new Academic III Building at the University of Texas at San Antonio", Interim draft review,November 22, 2000 |
|
|
|
BFW Construction Co., Ltd., Guaranteed maximum price proposal,July 15, 2002 |
|
|
|
"The University of Texas at San Antonio 1604 campus, Academic III Building program, program spaces review draft,"June 12, 2000 |
|
|
|
Workshop No. 1 for the new Academic III Building,November 12, 1998 |
|
|
|
Centex, Academic III Building,undated |
|
|
|
Conceptual design comments,2002 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recreation and Wellness Center |
Box |
48 |
|
|
Summary report for lessons learned and design phase kick-off partnering meetings,November 16-17, 2004 |
|
|
|
Phase II |
|
|
|
|
Specifications for moveable furnishings,December 6, 2006 |
|
|
|
|
F and S Partners, Statement of qualifications,August 10, 2004 |
|
|
|
|
Budget item summary report,August 22, 2006 |
|
|
|
|
Partial floor furniture plan |
Drawer |
62 |
|
|
|
|
First floor, 2004 |
|
|
|
|
|
Second floor, 2004 |
|
|
|
|
|
Outdoor/swimming pool, 2004 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Student dormitories |
Box |
18 |
|
|
Planning and construction files [Chisholm Hall] |
Box |
19 |
|
|
|
1980- March, 1986 |
|
|
|
|
April-December, 1986 |
Box |
18 |
|
|
|
1987-1991 |
|
|
|
|
Phase II and III1992-1994 |
|
|
|
|
Phase II dormitories,1987-1988 |
|
|
|
Apartment complex [University Oaks] |
|
|
|
|
1982-1990 |
|
|
|
|
1991 |
|
|
|
|
1992 |
Box |
19 |
|
|
Housing office,1987-1998 |
|
|
|
Chaparral Village |
Box |
47 |
|
|
|
Hot water return piping repair options,2006 |
|
|
|
|
WJE Engineers Architects Material Scientists, "Copper corrosion, report assessment Chaparral Village,"2006 |
|
|
|
|
HMG Consulting Mechanical Electrical Engineers, "Corrosion/erosion occurring in the hot water returns system,"2006 |
|
|
|
|
Bryant-Lee Metallurgical Engineering Testing Failure Analysis, "Metallurgical failure analysis report,"2006 |
|
|
|
|
Request for qualifications design/build services for the University of Texas at San Antonio student housing expansion,January 11, 2002 |
|
|
|
Student Housing Expansion Project [Laurel Village] |
|
|
|
|
Phase I |
Box |
48 |
|
|
|
|
BOKA Powell, Schema B master plan, undated |
|
|
|
|
|
BOKA Powell, Presentation of qualifications, undated |
|
|
|
|
|
Centex/FPC floorplans, October 31, 2000 |
Drawer |
45 |
|
|
|
|
|
Downtown campus: phase IV schematic design, 2000 |
Box |
48 |
|
|
|
|
C.F. Jordan L.P., Response to request for proposal, Dining Hall, December 18, 2003 |
|
|
|
|
|
C.F. Jordan L.P., Response to request for proposal, Student Housing Expansion, June 10, 2003 |
|
|
|
|
|
Facility Programming and Consulting, A program for the new residence hall-phase I project, February 21, 2002 |
|
|
|
|
|
Interior furnishings design development manual, September 26, 2003 |
|
|
|
|
|
Pre-construction manual, July 24, 2003 |
Drawer |
45 |
|
|
|
|
Scheme B master plan, undated |
|
|
|
|
Phase II |
Box |
48 |
|
|
|
|
BOKA Powell, Statement of qualifications, August 30, 2004 |
|
|
|
|
|
Constructability services/cost quantity survey, August 02, 2005 |
|
|
|
|
|
Construction cost estimate, August 02, 2005 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
University Center |
|
|
|
Planning and construction files |
Box |
19 |
|
|
|
1984-1989 |
|
|
|
|
1977-1984 |
|
|
|
|
1984-1985 |
|
|
|
University Center expansion |
|
|
|
|
Contractor's pay estimates, 1996-1997 |
Box |
20 |
|
|
|
Planning and construction filesFebruary, 1992-April, 1993 |
|
|
|
|
|
January-August, 1994 |
|
|
|
|
|
1994 |
|
|
|
|
|
January-November, 1995 |
Box |
19 |
|
|
|
|
1995 |
Box |
20 |
|
|
|
|
|
Box |
21 |
|
|
|
Report of defects, 1997 |
|
|
|
Furnishings and equipment, 1985-1987 |
|
|
|
Hardware schedule, 1985-1987 |
|
|
|
Job meetings |
|
|
|
|
1984-1985 |
|
|
|
|
1985-1986 |
|
|
|
Pay estimates, 1985-1986 |
|
|
|
Report of defects, 1986 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UTSA Downtown |
Box |
21 |
|
|
Phase I 1995-1998 |
Box |
|
|
|
Phase II |
Box |
22 |
|
|
|
May-December, 1995 |
|
|
|
|
January-February, 1996 |
|
|
|
|
1995-1996 |
|
|
|
|
1997-1998 |
Box |
21 |
|
|
|
1996-1999 |
|
|
|
|
1998 |
Box |
22 |
|
|
Phase III,1996 |
|
|
|
Downtown Advisory Group, 1996 |
|
|
|
Report of defects, 1997-1998 |
|
|
|
Signage and graphics |
Box |
47 |
|
|
|
Garage and interior signage, sign drawings and sign location plans, bid documents,April 23, 2001 |
|
|
|
|
Sign message schedule, full design review,March 28, 2001 |
|
|
|
|
Sign message schedule, fd2s inc., Strategic Design, Communication, and Branding,October 20, 2000 |
|
|
|
|
Specifications, full design review [2 copies],March 28, 2001 |
|
|
|
Summary report for construction phase partnering workshop [2 copies],April 4, 2002 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Energy and utilities |
Box |
23 |
|
|
Campus high voltage cable, 1984-1986 |
|
|
|
Campus water supply, 1979-1996 |
|
|
|
Chill water/steam west campus, 1983-1984 |
|
|
|
City of San Antonio energy study, 1983-1987 |
|
|
|
Easement documents, 1972-1995 |
|
|
|
Electrical, 1972-1995 |
Box |
24 |
|
|
Electrical transformer vault meter readings, 1995-1998 |
|
|
|
Expansion of sub-station, 1986 |
|
|
|
Fire station hydrant flow test, 1973-1983 |
|
|
|
Gas, 1972-1996 |
|
|
|
Infrastructure/electrical, 1986-1993 |
|
|
|
Re-use water master plan, 1995 |
|
|
|
Sewer lines |
|
|
|
|
1975-1993 |
|
|
|
|
1971-1977 |
|
|
|
|
1977-1997 |
|
|
|
Storm drainage, 1971-1973, 2000 |
|
|
|
Thermal Energy Plant |
Box |
24 |
|
|
|
Performance evaluation contract,1997 |
Box |
25 |
|
|
|
Win-Sam,1972-1999 |
|
|
|
|
Expansion,1977-1981 |
|
|
|
|
Purchase,1980-1983 |
|
|
|
|
Re-calibration of instruments,1976-1997 |
|
|
|
|
Utilities bills |
|
|
|
|
|
1980-1985 |
|
|
|
|
|
1986-1989 |
Box |
26 |
|
|
|
|
1990-1998 |
|
|
|
Underground/aboveground storage, 1990-1997 |
|
|
|
Utilities correspondence |
|
|
|
|
General correspondence |
|
|
|
|
|
1973-1977 |
|
|
|
|
|
1977-1997 |
|
|
|
|
Boiler and machinery |
|
|
|
|
|
1975-1980 |
|
|
|
|
|
1980-1998 |
|
|
|
|
CDAs |
|
|
|
|
|
1976-1980 |
Box |
27 |
|
|
|
|
Submittals,1976-1981 |
|
|
|
|
Cogeneration, 1985-1998 |
|
|
|
|
City Public Service Board, 1971-1998 |
|
|
|
|
Drought management plan,1988-1990 |
|
|
|
|
Emergency generator, 1979 |
|
|
|
|
Emergency generator replacement, 1993-1994 |
|
|
|
|
Energy conservation/Governor's office, 1979-1996 |
|
|
|
|
Energy consumption report, 1974-1998 |
|
|
|
|
Energy management,1988-1997 |
|
|
|
|
Enfield tank, 1998 |
|
|
|
|
Environmental Protection Agency (EPA) and Texas Air Control Board (TACB), 1971-2000 |
|
|
|
|
Fire alarm and sprinkler system, 1975-1999 |
|
|
|
|
Gasoline conservation program, 1979-1980 |
Box |
28 |
|
|
|
Primary and secondary switcher,1973-1986 |
|
|
|
|
Purchased utilities, 1982-1997 |
|
|
|
|
Regional action, 1987-1995 |
|
|
|
|
San Antonio Water System,1971-2000 |
|
|
|
|
Solar energy system, 1977-1994 |
|
|
|
|
|
1974-1977 |
|
|
|
|
|
1977-1994 |
|
|
|
|
Utility audits,1996-1998 |
|
|
|
|
Utility costs (4.5 day week),1974-1997 |
|
|
|
|
Water conservation, 1984-1996 |
|
|
|
|
DEC contract through Department of Information Resources, 1993 |
|
|
|
Facilities Control and Monitoring System (FCMS) |
|
|
|
|
Contract and proposal, 1979-1992 |
Box |
29 |
|
|
|
Staefa, Inc. |
|
|
|
|
|
Correspondence |
|
|
|
|
|
|
1977-1979 |
|
|
|
|
|
|
1979-1997 |
|
|
|
|
|
Maintenance and license agreement, 1979-1999 |
|
|
|
|
Energy conservation |
|
|
|
|
|
Energy audit--LoneStar, 1989-1994 |
|
|
|
|
|
Campus activity, 1979-1994 |
|
|
|
|
|
Energy savings projects, 1979-1998 |
|
|
|
|
|
Natural gas utilization report, 1989-1995 |
|
|
|
|
|
Energy conservation program, 1984-1989 |
|
|
|
|
|
Regulations planning totem, 1978-1983 |
Box |
30 |
|
|
|
Agency action tips, 1996 |
|
|
|
|
A/C duct problems (cleaning), 1993-1998 |
|
|
|
|
Alternative fuels waiver, 1996 |
|
|
|
|
Alternative fuels charging station, 1992-2000 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Health and safety |
Box |
44 |
|
|
Air quality/building emissions,1991-2000 |
|
|
|
Asbestos/lead removal regulations,1993-1998 |
|
|
|
Campus emergency plan,1994-1997 |
|
|
|
Drinking fountain (lead),1989-1996 |
|
|
|
College Safety Committee, 1983-1995 |
|
|
|
Environmental Health and Safety Committee, 1990-1992 |
|
|
|
Fire drills and evacuations |
|
|
|
|
1982-1997 |
|
|
|
|
1985-1992 |
|
|
|
Flood hazard evaluation--guidelines for state agencies,1990 |
|
|
|
Hazardous waste shipping,1983-1997 |
Box |
45 |
|
|
Laboratory/campus safety inspection, 1981-1991 |
|
|
|
Occupational Safety and Health Administration (OSHA),1974-1998 |
|
|
|
Occupational and safety programs,1995-1997 |
|
|
|
Office of Environmental Health and Safety, 1993-1994 |
|
|
|
Physical Plant Safety Committee,1995-1997 |
|
|
|
Radiation and biosafety, 1974-1993 |
|
|
|
Recycling, 1994-1997 |
|
|
|
Workers compensation insurance, 1994-1998 |
|
|
|
Wellness Awareness Action Committee, 1993-1994 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assorted projects |
Box |
13 |
|
|
Additional projects/bond money projects, 1979-1983 |
|
|
|
Legislative funded projects, 1999 |
|
|
|
Science Laboratory addition, 1982 |
|
|
|
Bookstore Building, 1985 |
Box |
14 |
|
|
Arts Building roadway |
|
|
|
|
1986-1988 |
|
|
|
|
1988-1990 |
|
|
|
Educational TV SB, 1989 |
Box |
23 |
|
|
Request for budget change, 1975-1983 |
|
|
|
Legislative budget board (LBB), 1984-1995 |
Box |
30 |
|
|
Executive action contracting services [hazardous waste removal], 1979-1994 |
|
|
|
Accident report procedure, 1993-1997 |
|
|
|
Building insurance, 1996-1998 |
Box |
36 |
|
|
Downtown class schedules, 1997-1998 |
Box |
47 |
|
|
Specifications for a library-surge facility at the University of Texas at San Antonio, Texas, 1973 |
|
|
|
Space utilization |
Box |
49 |
|
|
|
Classroom and class lab utilization report,2003-2004 |
|
|
|
|
Space management report,1997 |
|
|
|
Main campus parking garage |
Box |
49 |
|
|
|
HOK/BFW-SA, Campus main parking garage phase III, guaranteed maximum price proposal,June 10, 2004 |
|
|
|
|
Facility Programming and Consulting, A building program for the new parking garage at the University of Texas at San Antonio,February 9, 2004 |
|
|
|
Campus security lighting |
Box |
49 |
|
|
|
Goetting and Associates, Feasibility Study [2 copies],September 8, 1999 |
Box |
50 |
|
|
|
UTSA, Reliant Energy Solutions prepared by Light Management Consultants,undated |
|
|
|
University Center expansion, Phase III, Carter Burgess proposal, undated |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Correspondence |
|
|
|
Departmental correspondence |
Box |
30 |
|
|
|
Academic technology, 1995 |
|
|
|
|
Admissions and registrar, 1994-1997 |
|
|
|
|
Art and Architecture |
Box |
31 |
|
|
|
|
General, 1976-1998 |
|
|
|
|
|
Art reservations, 1976-1983 |
|
|
|
|
|
Division of Music, 1976-1998 |
|
|
|
|
|
Sculpture and ceramics, 1976-1993 |
|
|
|
|
|
Teaching gallery,1986-1992 |
Box |
30 |
|
|
|
Athletics,1976-1997 |
|
|
|
|
Bookstore, 1993 |
|
|
|
|
Budget office (Associate Vice President of Business Affairs),1997 |
Box |
31 |
|
|
|
Center for Applied Research, 1978-1995 |
|
|
|
|
Central Technical Services (CTS/CART), 1977-1988 |
Box |
30 |
|
|
|
College of Business, 1976-1997 |
|
|
|
|
College of Continuing Education, 1975-1988 |
|
|
|
|
College of Fine Arts and Humanities, 1975-1997 |
|
|
|
|
College of Science and Engineering |
Box |
31 |
|
|
|
|
1974-1984 |
|
|
|
|
|
1984-1997 |
|
|
|
|
Division of Life Sciences, 1976-1997 |
Box |
32 |
|
|
|
Division of Math, Computer Science, and Statistics, 1976-1997 |
|
|
|
|
Division of Earth and Physical Sciences, 1973-1997 |
|
|
|
|
Science facilities-west campus, 1975-1996 |
|
|
|
|
College of Social Behavioral (Policy) Sciences, 1973-1997 |
|
|
|
|
Computing resources, 1997-1998 |
|
|
|
|
Information Technology/Telephone Services, 1994-1998 |
|
|
|
|
Controller/Associate Vice President of Business Affairs, 1994-1997 |
|
|
|
|
Development Office, 1996-1998 |
|
|
|
|
Division of Engineering, 1981-1997 |
Box |
36 |
|
|
|
Downtown Building Operations-Cypress Tower, 1992-1996 |
Box |
32 |
|
|
|
Duplicating Services, 1994-1999 |
|
|
|
|
Employee training, 1994-1998 |
|
|
|
|
Food services cafeteria, 1993-1996 |
Box |
36 |
|
|
|
HemisFair Park |
|
|
|
|
|
"Kodak, Women's, and A&M Pavilions Building Assessment,"1991 |
|
|
|
|
|
General information,1977-1995 |
|
|
|
|
|
Utilities,1985-1997 |
|
|
|
|
|
Hayes Production Building,1982-1985 |
|
|
|
|
|
Kodak Building,1989 |
|
|
|
|
|
Women's Pavilion Building,undated |
Box |
32 |
|
|
|
Human Resources, 1982, 1994-1998 |
Box |
36 |
|
|
|
Institute of Texan Cultures |
|
|
|
|
|
General |
|
|
|
|
|
|
1966-1978 |
|
|
|
|
|
|
1978-1998 |
|
|
|
|
|
Utilities,1996-1997 |
|
|
|
|
|
Land exchange,1975-1996 |
|
|
|
|
|
Asbestos/lead-drinking water,1996 |
|
|
|
|
|
Energy plant performance contract,1997-1998 |
|
|
|
|
|
Library archives,1995-1998 |
|
|
|
|
|
Re-modeling,1974-1998 |
Box |
32 |
|
|
|
Institutional Studies, 1980-1995 |
Box |
33 |
|
|
|
Internal audit, 1992-1998 |
|
|
|
|
Libraries, 1994-1996 |
Box |
37 |
|
|
|
Lutcher Center |
|
|
|
|
|
General |
|
|
|
|
|
|
1966-1985 |
|
|
|
|
|
|
1986-1992 |
|
|
|
|
|
Boiler,1973-1983 |
|
|
|
|
|
Conference room floor,1979 |
|
|
|
|
|
Foundation problems |
|
|
|
|
|
|
General, 1970-1983 |
Box |
47 |
|
|
|
|
|
New foundation for Main House Lutcher Center- UTSA, Phase I, 1982 |
Box |
37 |
|
|
|
|
Land sale,1983-1988 |
|
|
|
|
|
Lease to National Center for the Study of Constitutional Democracy (NCSCD),1983 |
|
|
|
|
|
Pest control,1971-1979 |
|
|
|
|
|
Pool, 1956-1978 |
|
|
|
|
|
Rehabiliation |
|
|
|
|
|
|
1981-1985 |
|
|
|
|
|
|
1985-1986 |
Box |
38 |
|
|
|
|
|
1986-1988 |
Box |
37 |
|
|
|
|
Tree trimming,1972-1981 |
|
|
|
|
|
Water-sewer-fire protection,1976-1981 |
|
|
|
|
|
Well, 1980-1985 |
Box |
33 |
|
|
|
Mail service, 1998-1999 |
Box |
39 |
|
|
|
Office of Facilities Planning and Construction, 1994-1999 |
|
|
|
|
Office of General Counsel, 1996-1998 |
Box |
33 |
|
|
|
Office of International Programs and Studies, 1996 |
Box |
39 |
|
|
|
Office of Lands and Endowment Real Estate, 1991 |
Box |
Office of the President |
|
|
|
|
Box |
33 |
|
|
|
|
President Peter T. Flawn, 1973-1977 |
|
|
|
|
|
President James W. Wagener,1978-1989 |
|
|
|
|
|
President Samuel A. Kirkpatrick, 1990-1999 |
Box |
39 |
|
|
|
Office of Relocations, 1993-1995 |
Box |
33 |
|
|
|
Office of Research and Development, 1989-1991 |
|
|
|
|
Office of Communications, 1994-1997 |
|
|
|
|
Payroll Department, 1995 |
|
|
|
|
Purchasing Department, 1994-1997 |
|
|
|
|
R.O.T.C. Air Force, 1981-1995 |
|
|
|
|
R.O.T.C. Army, 1978-1988 |
|
|
|
|
Special events coordinator, 1990-1999 |
|
|
|
|
Special services, 1979 |
|
|
|
|
Student financial aid, 1975-1996 |
|
|
|
|
Student Health Services, 1975-1995 |
|
|
|
|
Student Information, 1997 |
|
|
|
|
Student leadership activities, 1977-1999 |
Box |
34 |
|
|
|
Student life, 1985-1997 |
|
|
|
|
Student representative assembly, 1977-1993 |
|
|
|
|
Student services affairs, 1975-1996 |
|
|
|
|
University Center operations, 1986-1996 |
Box |
38 |
|
|
|
University of Texas Health Science Center,1974-1975 |
Box |
34 |
|
|
|
UTSA Police Department reports |
|
|
|
|
|
1993-1997 |
|
|
|
|
|
1998 |
|
|
|
|
UTSA Police Department emergency response plan, 1995 |
|
|
|
|
Vice Provost of Academic Affairs, 1973-1998 |
|
|
|
|
Vice President for Administration and Planning, 1975-1997 |
|
|
|
|
Vice President for Business Affairs |
|
|
|
|
|
Mahon, Everett M., 1973-1978 |
|
|
|
|
|
Hammon, Gary L. |
|
|
|
|
|
|
1978-1979 |
Box |
35 |
|
|
|
|
|
1979-1982 |
|
|
|
|
|
|
1983-1984 |
|
|
|
|
|
Pederson, E.J., 1984-1989 |
|
|
|
|
|
Williams, M. Dan |
|
|
|
|
|
|
1986-1994 |
|
|
|
|
|
|
1992-1995 |
|
|
|
|
|
Larson, David L., 1994-1999 |
|
|
|
|
Vice President for Downtown Operations, 1991-1994 |
|
|
|
|
Vice President for University Advancement, 1991-1996 |
|
|
|
|
115 Blue Star, 1993 |
|
|
|
|
209 Sir Arthur Court [former UTSA President's residence], 1976-1990 |
Box |
38 |
|
|
|
13714 Bluffgate [former UTSA President's residence], |
|
|
|
|
|
1987-1991 |
|
|
|
|
|
1991-1992 |
|
|
|
|
|
1993 |
|
|
|
|
|
1993-1996 |
|
|
|
Committee correspondence |
Box |
42 |
|
|
|
Academic Resources Committee, 1974 |
Box |
43 |
|
|
|
Ad Hoc Committee on the Use of Campus Facilities, 1977 |
Box |
42 |
|
|
|
Ad Hoc Committee on Uniform Insurance Benefits, 1989 |
Box |
43 |
|
|
|
Ad Hoc Committee to Establish Phi Beta Kappa, 1976 |
Box |
42 |
|
|
|
Ad Hoc Public Transportation Committee, 1996 |
Box |
43 |
|
|
|
Ad Hoc University Student Housing Planning Committee, 1981 |
Box |
42 |
|
|
|
Affirmative Action Program, 1976-1978 |
|
|
|
|
Building Advisory Committee, 1971-1998 |
|
|
|
|
Building Committee Science Building, 1995 |
|
|
|
|
Committee on Higher Education Insurance Program, 1973-1998 |
|
|
|
|
Downtown Ad Hoc Committee |
Box |
35 |
|
|
|
|
1993 |
Box |
36 |
|
|
|
|
1994 |
Box |
42 |
|
|
|
|
Phase III,1997-1998 |
Box |
43 |
|
|
|
Downtown Building Committee, 1995 |
|
|
|
|
Emergency Energy Budget Committee, 1974-1988 |
|
|
|
|
Employee Insurance Benefits Committee, 1994 |
|
|
|
|
Employee Relations Council, 1997-1998 |
Box |
39 |
|
|
|
Employee Training and Development Advisory Group, 1981-1983; 1997 |
Box |
43 |
|
|
|
Faculty Committee, 1974 |
Box |
42 |
|
|
|
Institutional Committee on Animal Care and Utilization, 1979-1990 |
Box |
43 |
|
|
|
Office of Facilities Planning and Construction Fee Committee, 1995-1996 |
|
|
|
|
Planning and Leadership Council, 1996-1998 |
|
|
|
|
SACS Self-study Committee |
Box |
43 |
|
|
|
|
Physical Resources Committee,1989-1995 |
|
|
|
|
|
Steering Committee,1988 |
|
|
|
|
|
Student Survey Committee,circa 1988 |
|
|
|
|
Smart Card Committee, 1996 |
|
|
|
|
Temporary Student Union, 1977-1982 |
|
|
|
|
Parking and Traffic Committee, 1975-1998 |
|
|
|
|
University Assembly |
|
|
|
|
|
1975-1992 |
|
|
|
|
|
1994-1996 |
Box |
42 |
|
|
|
University Standing Committee, 1977-1993 |
|
|
|
Physical plant correspondence |
Box |
41 |
|
|
|
ANSI standards, 1989-1992 |
|
|
|
|
Association of Higher Education Facilities Officers UTSA report, 1993 |
|
|
|
|
Building budget data, 1993 |
|
|
|
|
Building occupancy load, 1987-1989 |
Box |
40 |
|
|
|
Budget items, 1993-1996 |
|
|
|
|
Capital improvements to UTSA |
Box |
40 |
|
|
|
|
February, 1990-June, 1995 |
|
|
|
|
|
May, 1995 |
|
|
|
|
|
July, 1995-2001 |
|
|
|
|
Commencement ceremonies |
Box |
41 |
|
|
|
|
High schools,1995-1997 |
|
|
|
|
|
UTSA,1990-2000 |
|
|
|
|
Equipment services receipts, 1975-1978 |
|
|
|
|
Fish fry/shrimp boil/shrimp fest, 1994-1998 |
|
|
|
|
Groundbreaking ceremonies, 1995-1997 |
|
|
|
|
Grants and contracts information, 1998 |
|
|
|
|
Handicapped projects/ADA, 1972, 1984-1998 |
Box |
40 |
|
|
|
Handbook, 1994-1998 |
Box |
41 |
|
|
|
Holiday call sheets/work schedule, 1994-1999 |
|
|
|
|
Letters of appreciation, 1994-1998 |
|
|
|
|
Market appraisal charts, 1996-2002 |
|
|
|
|
Memoranda |
Box |
42 |
|
|
|
|
1974-1984 |
Box |
41 |
|
|
|
|
1993-1998 |
Box |
42 |
|
|
|
Mobile radio equipment/FCC rules, 1986-1996 |
|
|
|
|
Miscellaneous annual functions [Groundbreaking, Laura Bush visit, Balloonfest],1986-1996 |
|
|
|
|
Moving services survey, 1976 |
|
|
|
|
Newspaper clippings, 1989 |
|
|
|
|
Olympic festival, 1992-1993 |
Box |
40 |
|
|
|
Organizational chart, 1991-2000 |
|
|
|
|
Organizational chart, 1991-2000 |
Box |
42 |
|
|
|
Personal computers, 1983-1994 |
Box |
40 |
|
|
|
Physical plant audits, 1993 |
Box |
42 |
|
|
|
Records retention schedule, 1995 |
|
|
|
|
Roadrunner, 1976-1995 |
|
|
|
|
Roofing survey information, 1977-1979 |
Box |
40 |
|
|
|
Staff meeting agendas, 1993-2000 |
Box |
41 |
|
|
|
Remodel schedule, 1997-1998 |
|
|
|
|
Safety, 1981, 1997 |
|
|
|
|
Telephone services, 1994-1998 |
Box |
42 |
|
|
|
Texas surplus, 1974-1975, 1990 |
|
|
|
|
Tree trimming service, Pando, 1972-1973 |
Box |
41 |
|
|
|
Utilities operations, 1994-1998 |
Box |
42 |
|
|
|
UTSA family picnic, 1994-1997 |
|
|
|
|
Vending machine receipts, 1991-1998 |
Box |
41 |
|
|
|
Vice President of Business Affairs staff meetings, 1994-1999 |
Box |
42 |
|
|
|
Vision 2010, 1990 |
Box |
41 |
|
|
|
Work management center, 1994-1997 |
|
|
|
Assorted correspondence |
Box |
38 |
|
|
|
All campus smart card, 1998 |
|
|
|
|
Bicycle master plan [City of San Antonio], 1974-1975 |
|
|
|
|
Board of Regents rules and regulations, 1996-1998 |
|
|
|
|
Business management council proceedings, 1994-1999 |
|
|
|
|
Campus fact sheets, 1973-1979 |
|
|
|
|
Campus ministries, 1993-1995 |
|
|
|
|
Card key system, 1972-1974 |
|
|
|
|
City building code,1964, 1989-1991 |
|
|
|
|
Texas Higher Education Coordinating Board,1994-1998 |
|
|
|
|
Cost savings, revenue enhancements, and cost avoidance,1998 |
|
|
|
|
Education facilities reservations and planning,1975, 1996-1997 |
Box |
39 |
|
|
|
Equipment, etc [wage rates],1995 |
|
|
|
|
Facilities reservation, 1996-1999 |
|
|
|
|
George Wright seminars/SACS self-study, 1979-1996 |
|
|
|
|
Historically Underutilized Businesses (HUBs),1996-1999 |
|
|
|
|
Legislative updates (75th), 1997-1999 |
|
|
|
|
McDonough Brothers pit expansion, |
|
|
|
|
Miscellaneous UT System, 1995-1998 |
|
|
|
|
Minority and Women Owned Businesses, 1991-1992 |
|
|
|
|
National Association of Government Employees, 1996-1997 |
|
|
|
|
Olmos Creek flood plan,1969-1972 |
Box |
40 |
|
|
|
One Stop Shop, 1998 |
|
|
|
|
Public transportation,1977-1978, 1997 |
|
|
|
|
Registered faculty, staff, and student organizations,1986-1998 |
|
|
|
|
Registration information, 1994-1997 |
|
|
|
|
SECC (United Way), 1996 |
|
|
|
|
Southwest Research Institute, 1979 |
|
|
|
|
Space assignment and utilization,1994-1997 |
|
|
|
|
Status of institutional contingency,undated |
|
|
|
|
Total quality management, 1992 |
|
|
|
|
Uniform general conditions--contract and wages law,1986-1997 |
|
|
|
|
VP staff meetings (GL Hammon), 1979 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Administrative records |
|
|
|
Professional organizations |
Box |
43 |
|
|
|
Membership applications,1975-2001 |
|
|
|
|
Central Association of Physical Plant Administrators (CAPPA),1995-2000 |
|
|
|
|
National Association of College and University Business Officers benchmark survey,1998-1999 |
Box |
44 |
|
|
|
Texas Association of Physical Plan Administrators of Universities and Colleges (TAPPA),1978-1998 |
|
|
|
|
Texas Association of State Senior College and University Business Officers (TASSCUBO),1996-1997 |
|
|
|
|
Technology '95, '96, '97 conference,1996-1998 |
Box |
49 |
|
|
Vice President for Business Affairs annual report, 1999 |
Return to the Table of Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Charles Lampe, Director of Campus Planning, Project files |
Box |
50 |
|
|
Academic advising officers, 1999-2000 |
|
|
|
Academic Building III [Main Building], 1997-2000 |
|
1-3 |
|
|
General, 1997-2001 |
|
|
|
|
Vacated space study, 2000 |
|
|
|
Administrative memoranda, 1996-1998 |
|
|
|
Architectural design guidelines, 1999 |
|
|
|
Brooks Air Force Base Building 175W, 2001-2002 |
|
|
|
Budget, 2005-2006 |
|
1-5 |
|
Capital Improvement Program, 1998-2005 |
Box |
Folder |
51 |
6-10 |
|
Capital Improvement Program, 1998-2005 |
|
|
|
Commissioning process, 2004 |
|
|
|
Downtown neighborhood plan, 1997-1998 |
|
|
|
Downtown advising group, 1997-1998 |
|
|
|
Downtown campus stakeholders, 1998-1999 |
|
|
|
Downtown Campus Building, Phase III [Durango Building] |
Box |
51 |
|
|
|
Project team meeting minutes and agendas, 1999-2001 |
|
|
|
|
Design development review meeting minutes, 1999 |
|
|
|
|
Executive summary, undated |
|
|
|
|
Team project directory, 1999 |
|
|
|
|
"UTSA Downtown campus expansion traffic impact analysis", 1998 |
|
|
|
|
Conceptual design review comments, 2000 |
|
|
|
|
Space issues, 2000 |
|
|
|
|
Art installation project, Labyrinth Gateway, 2002 |
|
|
|
|
Signage, 1998-2001 |
|
|
|
|
Project files |
Box |
Folder |
51 |
1-3 |
|
|
|
1999-2001 |
Box |
Folder |
52 |
4-6 |
|
|
|
1999-2001 |
|
|
|
Market value appraisal 6.0027 acres located north of Durango Boulevard [...], 2000 |
|
1-4 |
|
Master plan, 1993-2001 |
|
|
|
Multidisciplinary Studies Building/John Peace Library space study, 2000 |
|
|
|
Parking, 1999 |
|
|
|
Physical Plant Directors Conference, 2005 |
|
|
|
Project Information Form (PIFs), 2006 |
|
|
|
Radisson Hotel, 502 Durango Boulevard, 2005 |
|
|
|
Recreation and Wellness Center, 1998-2004 |
|
|
|
Scobey Complex, 1996-2000 |
|
|
|
SAISD Navarro Childcare, 2002 |
|
|
|
Southern Association of Colleges and University Business Officers (SACUBO) conference planning committee, 2003 |
|
|
|
Student housing, 2001-2003 |
Box |
53 |
|
|
TexDot destination signage project, 2004 |
|
|
|
Thermal energy plant, 1998-1999 |
|
|
|
Tradeline, 1999 |
|
|
|
Tuition bond revenue, 2005 |
|
|
|
UTSA 1604 Campus karst features/endangered species, 2002 |
|
|
|
UTSA land, 2002 |
|
|
|
West campus laboratory building, 2004-2005 |
|
|
|
Valero, 2004-2005 |
Drawer |
59 |
|
|
|
Aerials of Valero tract,2005-06-17 |